OXFORD

Ramp build in Piedmont (Snapp family)

LOCATION 301 Daily Street Piedmont, Alabama 36272 DESCRIPTION

Another project for the Skills Team through our partnership with Alabama Department of Rehabilitation and SAIL. This is a more complex build consisting of 38’ of ramp, a 90° turn, and two level landing areas. We will use 8 prefab modular frames plus other materials delivered on site.

15-18, 19-22, 20s, 30s, 40s, 50s, 60s+
TIME Start: 3/1/2025 9:00am  End: 3/1/2025 2:00pm CATEGORY Community Outreach, Minor Home Repairs, Outdoor, Skilled Construction SKILLS NEEDED Carpentry, Construction, Communication, Organizational SUPPLIES NEEDED Not Specified TOOLS NEEDED Hammer, Tape Measure, Miter Saw, Drill, Level, Sawhorse, Sander, Nail Gun, Gloves 3 PEOPLE NEEDED
3 PEOPLE NEEDED